plumettaz

Watucab

$0.00
Get a Quote

Large power cables for the energy distribution are in the hands of the Watucab™, which can handle the highest requirements and offers several options to interconnect the grid.

Watucab™ is designed for installing underground cables for low, medium and high voltage power networks. Especially effective over long distances and tortuous routes, it enables higher performance than that achieved with conventional installation techniques. In addition, Watucab™ benefits from the latest technological innovation combining floating, pushing and pulling with water or free floating.

A quick installation of this compact and mobile equipment, as well as a high cable laying speed increase daily productivity. Its use requires fewer operators, reduces the number of connections and the number of access chambers. All operations are located at a single-entry point, which facilitates and secures installation.

This method avoids the synchronization and high installation forces required by traditional cable laying methods. The risk of damaging cables disappears.

 Max pushing force is 3000 lbf. Can do single cable from 1.75" to 6" and triple cables 3 x 1" to 3 x 2.5"